OI Building Work

This Easter vacation the Oriental Institute is having many of its windows replaced. This may make the library quite noisy (and sometimes possibly quite cold), but we will be trying to keep up our normal opening hours. The work will happen in 4 main stages:
– The bike chain at the front of the building will be removed this Friday (24th Feb 2012). All bikes should be removed by 3:00pm or they will be left unsecured, no longer locked to anything.
– Then through the last weeks of term scaffolding will be erected, covering the front of the building.
– During the vacation itself the windows will be replaced. The Library is scheduled to be re-windowed from Wednesday 28th to Thursday 29th of March, but this may change.
– Finally at the start of next term the scaffolding will be removed.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: